Net Zero Strategy
GOAL
ACTIONS 2024
• 100% of Scope 2 electricity generation from certified renewable resources
• Investigate heat recovery options and provide funding options at two locations each year
Eliminate
• Increase covered storage for aggregate
• Investigate the cost-benefit associated with renewable power generation on our sites
• All sites to have half hourly/smart meters for gas, electricity and water
• Invest and create an online platform which monitors energy usage in real time for all asphalt plants • All sites to conduct an efficiency audit annually. Actions considered significant will be escalated to Board members with completion required in two weeks • Hold quarterly meetings with the Energy Review Committee and Energy Broker to identify savings • Asphalt production will utilise natural gas from the grid as a priority over gas and fuel oil
Improve Efficiency
• All static diesel generators based in depots (providing energy) will be using low GHG alternative fuel • New designs and updating of asphalt plant infrastructure will be subject to an efficiency and clean energy review
Diversify
• Provide green energy proposals to Board where there is a payback within five years • A minimum of £20,000 per year will be available for carbon saving initiatives put forward by Divisions within the business
Innovate
Actions 2030
• Remove all gas oil from FM Conway sites
• Fuel oil will be removed from sites where a suitable replacement is available