Westminster City Council King Street Low Carbon Trial - Client Report
First page
Table of contents
Next page
Last page
Executive Summary
3
Introduction
5
Background
6
Scope
7
Limitations
7
Aims & Objectives
7
Scheme Details
8
Baseline
13
Comparison between King Street & Marlborough Hill
13
Plant
17
Materials
18
Transportation
20
Suppliers
22
Marketing Campaign
24 - 25
Results
28
Embodied Carbon
34
Overall Carbon Usage
36
Other Environmental Benefits
37
Site Feedback
38
Testimonials
39
Financial Impact
41
Conclusion
48
Recommendations
51
Article – Highways magazine
54
Article – Asphalt Now
55
Article – Asphalt Industry Alliance
56
Article – NLA.london
57
Article – uk.100
58
Figure 1 - General Arrangement Drawing for King Street
10 - 11
Figure 2 - Shows the differences between the two schemes.
13
Figure 3 - General Arrangement Drawing for Marlborough Hill
14 - 15
Figure 4 - The JCB excavator in action on King Street
17
Figure 5 - Demonstrates the sustainable products and plant used
20
Figure 6 - Electric Van
21
Figure 7 - Speedy Hire Electric Taxi Delivery Vehicle
22
Figure 8 - Graph Showing the Comparison of Operational Carbon Produced on King Street & Marlborough Hill
29
Figure 9 - Pie Charts Showing the Carbon Produced by Type Across Both Schemes
30
Figure 10 - Graph Showing the Carbon Breakdown Across All Operations
32 - 33
Figure 11 - Bar Chart Showing the Total Carbon Footprint at both sites
34
Figure 12 - Graph showing how the embodied carbon is broken down
35
Figure 13 - Table showing the whole tCO2e carbon footprint for both schemes:
36
Figure 14 - Table showing the King Street carbon savings
36
Figure 15 - The table below shows the approximate costs of the extraordinary items
43
Figure 16 - Stacked Graph showing the additional costs against the scheme estimate
44
Made with
FlippingBook
Learn more on our blog