Westminster City Council King Street Low Carbon Trial
First page
Table of contents
Next page
Last page
Figure 1 - General Arrangement Drawing for King Street
10 - 11
Figure 2 - Shows the differences between the two schemes.
13
Figure 3 - General Arrangement Drawing for Marlborough Hill
14 - 15
Figure 4 - Westminster Footway Reconstruction Comparison Table
19
Figure 5 - Drawing of Current Specification – Footway Reconstruction (Scale 1:10)
19
Figure 6 - Drawing of Marshalls’ Specification (50mm slab Thickness) – Footway Reconstruction (Scale 1:10)
19
Figure 7 - Charging Point installation to power supply
21
Figure 8 - Charging Point installation to power supply
22
Figure 9 - The JCB excavator in action on King Street
23
Figure 10 Demonstrates the sustainable products and plant used
26
Figure 11 - Speedy Hire Electric Taxi Delivery Vehicle
28
Figure 12 - Graph Showing the Comparison of Operational Carbon Produced on King Street & Marlborough Hill
35
Figure 13 - Pie Charts Showing the Carbon Produced by Type Across Both Schemes
36
Figure 14 - Graph Showing the Carbon Breakdown Across All Operations
38 - 39
Figure 15 - Bar Chart Showing the Total Carbon Footprint at both sites
40
Figure 16 - Graph showing how the embodied carbon is broken down
41
Figure 17 - Table showing the whole tCO2e carbon footprint for both schemes:
42
Figure 18 - Table showing the King Street carbon savings
42
Figure 19 - The table below shows the approximate costs of the extraordinary items
49
Figure 20 - Stacked Graph showing the additional costs against the scheme estimate
50
Executive Summary
3
Introduction
5
Background
6
Scope
7
Limitations
7
Aims & Objectives
7
Scheme Details
8
Baseline
13
Comparison between King Street & Marlborough Hill
13
Methodology
17
PPM Standard Works Method – Marlborough Hill
17
King Street Deviations from Method - Operations
18
King Street Deviations from Method - Specification
18
PPM King Street Works Method
20
Power Supply
20
Specification
21
Plant
23
Materials
24
Transportation
26
Suppliers
28
Marketing Campaign
30 - 31
Results
34
Embodied Carbon
40
Overall Carbon Usage
42
Other Environmental Benefits
43
Site Feedback
44
Testimonials
45
Financial Impact
47
Conclusion
54
Recommendations
57
Article – Highways magazine
60
Article – Asphalt Now
61
Article – Asphalt Industry Alliance
62
Article – NLA.london
63
Article – uk.100
64
Appendix 1 – King Street Operations Carbon Footprint
68 - 69
Appendix 2 – Marlborough Hill Carbon Footprint
70 - 71
Appendix 3– Supervisor Check Sheet
72
– Site Set Up
72
Appendix 4 – Supervisor Check Sheet – Daily Record
74
Appendix 5 – Lessons Learnt Feedback from Site Staff
76 - 77