Westminster City Council King Street Low Carbon Trial
TABLE OF CONTENTS
3 5 6 7 7 7 8 11 11
Executive Summary
33 35 36 37 38 40 47 50 52 53 54 55 56
Embodied Carbon Overall Carbon Usage
Introduction Background
Other Environmental Benefits
Scope
Site Feedback Testimonials Financial Impact
Limitations
Aims & Objectives Scheme Details
Conclusion
Baseline
Recommendations
Comparison between King Street & Marlborough Hill
Article – Highways Magazine
14 14
Methodology
Article – Asphalt Now
PPM Standard Works Method – Marlborough Hill
Article – Asphalt Industry Alliance
Article – NLA. London
15
King Street Deviations from Method - Operations King Street Deviations from Method - Specification PPM King Street Works Method
Article – UK.100
15
60
Appendix 1 – King Street Operations Carbon Footprint Appendix 2 – Marlborough Hill Carbon Footprint Appendix 3– Supervisor Check Sheet – Site Set Up Appendix 4 – Supervisor Check Sheet – Daily Record Appendix 5 – Lessons Learnt Feedback from Site Staff
17 17 18
61
Power Supply Specification
62
20
Plant
21
Materials
64
23 25 26 29
Transportation
Suppliers
66
Marketing Campaign
Results
TABLES & GRAPHS
9 11
Figure 1 - General Arrangement Drawing for King Street Figure 2 - Shows the differences between the two schemes. Figure 3 - General Arrangement Drawing for Marlborough Hill Figure 4 - Westminster Footway Reconstruction Comparison Table
12 16 16
Figure 5 - Drawing of Current Specification – Footway Reconstruction (Scale 1:10)
16 Figure 6 - Drawing of Marshalls’ Specification (50mm slab Thickness) – Footway Reconstruction (Scale 1:10) 18 Figure 7 - Charging Point installation to power supply 19 Figure 8 - Charging Point installation to power supply 20 Figure 9 - The JCB excavator in action on King Street 23 Figure 10 - Demonstrates the sustainable products and plant used 25 Figure 11 - Speedy Hire Electric Taxi Delivery Vehicle 30 Figure 12 - Graph Showing the Comparison of Operational Carbon Produced on King Street & Marlborough Hill 31 Figure 13 - Pie Charts Showing the Carbon Produced by Type Across Both Schemes 32 Figure 14 - Graph Showing the Carbon Breakdown Across All Operations 33 Figure 15 - Bar Chart Showing the Total Carbon Footprint at both sites 34 Figure 16 - Graph showing how the embodied carbon is broken down 35 Figure 17 - Table showing the whole tCO2e carbon footprint for both schemes: 35 Figure 18 - Table showing the King Street carbon savings 42 Figure 19 - The table below shows the approximate costs of the extraordinary items 43 Figure 20 - Stacked Graph showing the additional costs against the scheme estimate
2
Made with FlippingBook. PDF to flipbook with ease