Westminster City Council King Street Low Carbon Trial
APPENDIX 2 – MARLBOROUGH HILL CARBON FOOTPRINT
Travel in Miles
Equipment in Minutes
Column1 Column2
Column3
Column4
Supervisor
Mason Operative Excavator
H&S Noise Monitorin Cusacks Concrete/Cement Sand Muckaway Slabs Welfare Service Various sphalt Hot BoRelocate 1.5t Excavator Wacker Disc Cutter Welfare Unit
Work Day
Date
Activity
Extents
1.4l Panel Van 3.5t Lorry Bus
3.5t Lorry Petrol Fie 1.6lcar
Transit
Grab
Grab
Grab 26t Arti
7.5t Lorry 7.5t Lorry 26t Lorry l 18t Low Loader
1 2 3 4 5 6 7 8 9
09/09/2020 Set Up 10/09/2020 Set Up
60m Fencing
35 35 35 35 39 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
30
Welfare &Compound
5
11/09/2020 Excavate Kerb 14/09/2020 Relay Kerb
25m Kerb, 7.5m Block Paving
38 38 38 38 38
240 240 240 240 240
30 30 90 30 30 30 30 60 30 30 30 30 30 30 30 30 30 30 30 60 60 60 30 60 60 60 60 30
Relay 25m Kerb
12
30
15/09/2020 Excavate Paving 75m2 ASP 16/09/2020 Excavate Sub Base 17m3 Sub Base
8
12
30 30 30
30
15 10 20
17/09/2020 Excavation 18/09/2020 Kerb & Paving
27m2 paving, 8m3 sub base, 8m kerb
50
8m kerb, 12m2 ASP
40
21/09/2020 Paving 22/09/2020 Paving 23/09/2020 Pointing
24m2 ASP 10m2 ASP
8
20 20
30 10
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
40m Pointing
10m kerb, 4m3 sub base, relay 10m kerb
38
120
15
24/09/2020 Excavate Kerb
25/09/2020 Paving 26/09/2020 Paving
20m2 ASP 27m2 ASP
50
20 10 25 20
30
28/09/2020 Paving & Pointing 6m2 ASP & 32m pointing 29/09/2020 Excavate Paving 25m2 ASP, Lay 3m2 ASP
30
60
30/09/2020 Pointing
48m pointing
25
01/10/2020 Excavate Paving 60m2 ASP, 15m3 Sub base
38 38 38 38
30 60
240 240
02/10/2020 Excavation 05/10/2020 Excavate Kerb 06/10/2020 Excavate Kerb
53m2 ASP, 10m3 sub base
18m kerb, 16m3 sub base, relay 18m ker 17m kerb, 16m3 sub base, relay 17m ker
30 30
30
30 20
30 30
90
07/10/2020 Paving 08/10/2020 Paving 09/10/2020 Paving
30m2 ASP 25m2 ASP 34m2 ASP
30
30 60
30
40
120
10/10/2020 Excavation 12/10/2020 Excavation 13/10/2020 Kerb & Paving
90m2 ASP, 60m2 pointing
38 38 38
25
240 240
30m kerb, 30m2 paving, 10m3 sub base
60 60
20 25
Relay 44m kerb, 12m2 ASP
60
14/10/2020 Paving 15/10/2020 Paving
Install 60m2 ASP
30
120 120
Install 29m2 paving, 10m pointing
30
30
4 4
16/10/2020 Pointing & Demob Install 90m pointing, relocate 70m barrie
17/10/2020 Demob
Relocate 100m barrier
29
25
30
20/10/2020 Asphalt Reinstate & Asphalt kerbline, relocate welfare
Total
2178 0.239
1860
248
988
32
120 0.14
48
480
200
720 200 1.78 1.29
160 0.98
246 0.78
100 1.51 151
10
2370 155 2.75 0.24 434.5 2.232
655 0.24
1140 2.54 304.8
kgCo2e
0.4 744
0
0.78 0.15
0.4
1.51 1.51
1.78 17.8
Total kgCo2e
520.542
0 770.64
4.8
16.8 19.2
724.8
302 1281.6 258
156.8 191.88
9.694
Notes & Assumptions KgCo2e figures have been taken from UK Government Conversion Factors for Greenhouse Gas (GHG) Reporting 2020 All vehicle journeys have been multiplied by 2 to cover the return journey Vehicles are diesel unless otherwise stated JCB Carbon figures have assumed usage of 4l per hour
Carbon figures for saw and wacker have assumed a 3kwh output Welfare Unit was filled 3 times over the course of the scheme
5.911088
Total Co2 Delivery
Breakdown
Tonnes
Percentage
Travel
2.056782 3.10308 0.751226
34.8% 52.5% 12.7%
Deliveries Operations
61
Made with FlippingBook. PDF to flipbook with ease